The Photo above shows a contractors crew installing a new Hydrant and Irrigation service. This was to provide water to a new soccer field in the Barb King Inspirational park. This project took place Summer of 2013 in conjunction with the road reconstruction on Meadowlark drive.

The Photo above shows the DMU utility crew excavating a 8 foot deep hole to fuse high density polyethylene pipe (HDPE) for the new 8 Inch raw water line from well number 1. This line was bored in from the Utility east on Bridge Avenue to 4th Street North.

The Photo above shows a DMU utility crew member performing maintenance on a transformer. In this case tightening secondary connections and inspecting for indication of possible future problems.